Tavego® is a line of prefabricated wooden panels for load-bearing walls and floors, assembled without the use of glues. C24 boards or KVH joists stacked side by side and joined together with mechanical connections. Briefly: eco-sustainability and prefabrication in a single structural element. Marlegno uses wood that comes only from PEFC certified forests, which guarantee a forest management that respects biodiversity requirements, development of the economic chain, regeneration capacity and maintenance of biological functions. Marlegno offers the possibility to build structures with wood coming from Italian forests as close as possible to its establishment. In this way it contributes to the development of the local business sector and drastically reduces energy costs associated with transportation. Tavego® is an innovative construction system for indoor spaces: the absence of synthetic glues for assembly of panels means a better health condition of the interior spaces for buildings, due to the lack of harmful products such as formaldehyde. The production of Tavego® requires only mechanical connections with wooden or metal elements, carried out with simple equipment and with very low energy consumption (for example, the absence of glues means that no presses are used). The use of prefabricated elements also helps to increase quality controls into the establishment and to transform the construction site in a simple assembly site, reducing on-site operations and timing. N-Lam Floor, P-Lam Floor, Onda Floor and Stack Wall are made of a single layer of wooden joists stcked side by side and connected with steel screws, and so they can contribute also to recycled content. D-Lam Floor and Cross Wall are made of a single layer of wooden joists stcked side by side and connected with beech wooden dowels.
Note: All the information below was checked with advisor QualityNet support
Green Features #3
PEFC
doneFormaldehyde Free
doneCE Mark
done
Credits for LEED® System #5
LEED NC ITALIA 2009
EAp2 Prestazioni energetiche minime
EAc1 Ottimizzazione delle prestazioni energetiche
MRc1.1 Riutilizzo degli edifici: mantenimento di murature, solai e coperture esistenti
MRc2 Gestione dei rifiuti da costruzione
MRc5 Materiali estratti, lavorati e prodotti a distanza limitata (materiali regionali)
QIc3.2 Piano di Gestione IAQ: prima dell'occupazione
SSp1 Prevenzione dell'inquinamento da attività di cantiere
QIc4.4 Materiali basso emissivi: prodotti in legno composito e fibre vegetali
LEED NC 2009
SSp1 Construction Activity Pollution Prevention
EAp2 Minimum Energy Performance
EAc1 Optimize Energy Performance
MRc1.1 Building ReuseMaintain Existing Walls, Floors, and Roof
MRc2 Construction Waste Management
IAQc3.2 Construction IAQ Management PlanBefore Occupancy
IAQc4.4 Low-Emitting MaterialsComposite Wood and Agrifiber Products
LEED FOR SCHOOLS 2009
SSp1 Construction Activity Pollution Prevention
EAp2 Minimum Energy Performance
EAc1 Optimize Energy Performance
MRc1.1 Building ReuseMaintain Existing Walls, Floors, and Roof
MRc2 Construction Waste Management
MRc5 Regional Materials
IAQc3.2 Construction IAQ Management PlanBefore Occupancy
IAQc4.4 Low-Emitting Materials - Composite Wood & Agrifiber Products
LEED BD+C V4
EAp2 Minimum Energy Performance
EAc2 Optimize Energy Performance
MRc3 Building Product Disclosure and Optimization - Sourcing of Raw Materials
MRc5 Construction and Demolition Waste Management
IAQc2 Low-Emitting Materials